For a compact galley kitchen, under 4m total run, allow a supply-only guide range of $8,000 – $12,000 for the joinery. A standard L-shape or single-wall kitchen, 4–7m, has a guide range of $12,000 – $20,000. Neither figure includes installation or all the other work needed to finish the room.
The tables cover kitchen cabinetry, wardrobes and whole-home joinery, followed by separate renovation allowances. They give you a starting point for a project discussion with Silk Touch Joinery, based in Camberwell and serving projects across Melbourne. For the kitchen service itself, see custom kitchen cabinetry in Melbourne.
All figures are planning guide ranges in Australian dollars, not a quote for your home or a Melbourne-wide market average. GST treatment is not specified. When you request a quote, have the supplier state the GST treatment and how long the price remains valid.
Table of Contents
What supply only means
Supply only excludes installation. The quote should spell out which cabinets, fronts and fittings it covers, including their construction and hardware. Delivery also needs to be confirmed; the words “supply only” do not establish whether it is included.
Silk Touch offers installation as well as supply. Whether installation is available for your project, what it covers and how it is priced need to be agreed separately from these supply-only allowances.
For the kitchen and whole-home ranges below, stone benchtops, appliances, plumbing and electrical work are also excluded. Any additional services need to be expressly agreed.
Kitchen joinery costs
| Kitchen scope | Supply-only guide range, AUD |
|---|---|
| Compact galley, under 4m total run | $8,000 – $12,000 |
| Standard L-shape or single-wall, 4–7m | $12,000 – $20,000 |
| Open-plan with island, 7m+ total run | $18,000 – $30,000+ |
The run lengths describe cabinetry, not room floor area. These are broad layout categories rather than prices per metre; a “+” means the upper figure is not a ceiling. Find the layout closest to your plans, then compare the drawings, finish, storage fittings and appliance requirements behind each quote.
A pantry or scullery needs its own list of cabinetry, appliances and any proposed sink. That gives you something specific to price, instead of estimating the room as a fixed percentage of the kitchen.
Wardrobe joinery costs
Installation is separate from the wardrobe supply-only ranges below.
| Wardrobe scope | Supply-only guide range, AUD |
|---|---|
| Single built-in robe, hinged doors, basic internal fit-out, 1800mm wide | $1,200 – $3,500 |
| Single built-in robe, full internal fit-out with drawers and LED, 1800mm wide | $2,500 – $6,000 |
| Full wall run, floor-to-ceiling, 3.0–4.0m wide, hinged doors | $6,500 – $11,000 |
| Walk-in robe, 2.0m × 2.4m, three-sided fit-out, no island | $4,000 – $8,000 |
| Walk-in robe, 2.4m × 3.0m+, island drawer unit and full fit-out | $9,000 – $12,000 |
| Master suite package: walk-in, bedhead joinery and occasional chair niche | $12,000 – $22,000+ |
The fit-out is worth describing in detail: how much hanging space you need, where shelves and drawers belong, and whether you want doors, mirrors or lighting. The quote should identify the included fittings and hardware. A guide range does not promise a particular brand or warranty.
Whole-home joinery costs
| Whole-home scope | Supply-only guide range, AUD |
|---|---|
| Whole-home: kitchen, laundry and wardrobes | $30,000 – $70,000+ |
For a whole-home quote, set out the joinery room by room. Include what you want to keep as well as what needs replacing, and make clear which services sit outside the joinery work.
You can then consider doing the rooms together or in stages, taking account of access, material choices and your priorities. The proposed manufacturing and installation sequence needs to suit your property. A combined brief does not guarantee a lower total or one installation period.
Separate kitchen renovation budget items
Cabinetry is one part of the renovation budget. Each allowance below covers a separate item or trade; together, they are not a quoted package. Adding the figures will not give you a price for your renovation.
| Trade or item | Scope | Guide allowance, AUD |
|---|---|---|
| Bespoke joinery | Supply only | $8,000 – $35,000+ |
| Stone benchtop | Supply and install | $2,500 – $12,000 |
| Appliances | Separate item | $4,000 – $25,000 |
| Splashback, tiling or glass | Separate item | $800 – $2,500 |
| Plumbing, relocation or new rough-in | Separate trade | $1,000 – $3,500 |
| Electrical, new circuits, lighting or rangehood | Separate trade | $800 – $3,000 |
| Painting, kitchen zone | Separate trade | $1,000 – $4,500 |
| Flooring, if replacing | Separate trade | $2,500 – $10,000 |
The bespoke-joinery row describes the same part of your budget as the kitchen table above. Do not count both allowances as separate costs. The broader range is not another layout tier or a ceiling on an open-ended “+” range. Installation still needs its own agreed scope and price.
These allowances do not mean Silk Touch supplies or manages every trade. Your agreement needs to identify who is supplying or arranging each item. If you plan structural changes or service relocation, establish which professionals, assessments and approvals your property needs. Our kitchen renovation budgeting guide explains how to keep the wider project costs and responsibilities visible.
Before comparing quotes
Keep the drawings and specification beside each quote so you can see what the price covers. Delivery, installation, exclusions, GST treatment and quote validity should be clear in writing. It is also worth settling how changes after approval would affect cost and timing, and where the programme depends on other work.
Apply the same comparison to flat-pack, semi-custom and bespoke options: look at the actual construction, dimensions, finishes, hardware and installation. The category name alone does not establish quality, lifespan or what the joinery will cost over time. For a closer comparison of drawings, finishes and fittings, read why custom kitchen cabinetry quotes vary.
Frequently asked questions
How much does a standard bespoke kitchen cost?
The supply-only guide range for a standard L-shape or single-wall kitchen, 4–7m, is $12,000 – $20,000. Installation, stone benchtops, appliances, plumbing and electrical work are excluded. A price for your home needs to be based on your own specification.
Does supply only include installation?
No. The supply-only ranges exclude installation. The written quote should make the cabinetry inclusions, delivery arrangements and installation scope clear.
Are these complete renovation prices?
No. The joinery ranges and individual renovation allowances cover different work. A complete project needs an itemised quote; a fixed multiplier applied to the cabinetry figure cannot provide that.
Do the guide ranges include GST?
GST treatment is not specified for these ranges. Have each supplier state it in the quote so you know which figures you are comparing.
Can I discuss several rooms with Silk Touch Joinery?
Yes. Send Silk Touch Joinery a project enquiry with your suburb and the rooms you have in mind. Include any plans or dimensions you already have. The team reviews the information and contacts you about the appropriate next step; an enquiry does not confirm an appointment, price or installation date.